A201, Section 3.7.4: Concealed or Unknown Conditions

A201, Section 3.7.4: Concealed or Unknown Conditions

Why Is AIA A201-2017, General Conditions, Among the Most Important Contract Documents?See more

Why Is AIA A201-2017, General Conditions, Among the Most Important Contract Documents?

A201- 2017, Section 3.14: Cutting and PatchingSee more

A201- 2017, Section 3.14: Cutting and Patching

A201, Section 3.9: The SuperintendentSee more

A201, Section 3.9: The Superintendent

A201, Section 3.11: Documents and Samples at the SiteSee more

A201, Section 3.11: Documents and Samples at the Site

A201-2017 Section 3.7 - Permits, Fees, Notices, and Compliance with LawsSee more

A201-2017 Section 3.7 - Permits, Fees, Notices, and Compliance with Laws

A201, Sections 2.4 and 2.5: The Owner's Right to Stop and To Carry Out the WorkSee more

A201, Sections 2.4 and 2.5: The Owner's Right to Stop and To Carry Out the Work

A201, 3.1.2: Contractor’s obligation to perform the work in accordance with the contract documentsSee more

A201, 3.1.2: Contractor’s obligation to perform the work in accordance with the contract documents

A201, Sections 3.10 and 3.11: The Contractor's Construction and Submittal ScheduleSee more

A201, Sections 3.10 and 3.11: The Contractor's Construction and Submittal Schedule

A201, Section 3.5: The Contractor's WarrantySee more

A201, Section 3.5: The Contractor's Warranty

A201, Section 3.2: Review of Contract Documents and Field Conditions by ContractorSee more

A201, Section 3.2: Review of Contract Documents and Field Conditions by Contractor

Part 1: A201 Section 3.12-Shop Drawings, Product Data, and SamplesSee more

Part 1: A201 Section 3.12-Shop Drawings, Product Data, and Samples

Part 2: A201-2017 Section 3.12 - Delegated DesignSee more

Part 2: A201-2017 Section 3.12 - Delegated Design

Three AIA Contract Provisions Every Owner and Contractor Should UnderstandSee more

Three AIA Contract Provisions Every Owner and Contractor Should Understand

What is the Difference Between 3.1 and 3.2 MTC (Material Test Report) as per EN10204?See more

What is the Difference Between 3.1 and 3.2 MTC (Material Test Report) as per EN10204?

The Instruments of Service in Construction ContractsSee more

The Instruments of Service in Construction Contracts

Актуальное